Smith Road Resurfacing Construction
Smith Road from Sheldon to Pearl is open to two-way traffic. Perk is continuing to stabilize exposed soil for temporary erosion control. AT&T and CEI will continue relocating their equipment from now and into the Spring.
In the Spring, landscaping, permanent striping, tree lawn repair and any final punch list items with the roadway will resume.
Please check back in the Spring for project updates.

